10-Year Timeline

2002
first Romanian carrier-neutral data center ( November 22, 2002), 50sqm data room surface, 1x100kVA total capacity, personnel team of 4
2003
capacity upgrade to 2x100kVA
2004
data room upgrade to 100sqm; all major local telecom operators set PoPs on site
2005
redundant pre-run underground conduit pipes installed for easy telecom network access
2006
additional 100sqm data room upgrade; UPS capacity upgrade to 2x120KVA; VESDA system installed
2007
diesel genset capacity upgrade to 2x330kVA
2008
NXDATA-1 diesel genset capacity upgrade to 2x600kVA, NXDATA-2 stage 1 completed; 400sqm, 2x330kVA genset, 2 x180kVA UPS
2009
100sqm NXDATA-1 data room surface upgrade
2010
NXDATA-2 Diesel capacity upgrade to 2x1015kVA, UPS capacity upgrade from 2x180kVA to 4x200kVA
2011
NXDATA joins the International Data Center Group alliance
2012
first stage of a new 300sqm data room expansion for NXDATA-1 (200sqm of net DC); total net DC space: 1000sqm, total Diesel capacity: 2x1600kVA; 2.300.000 Euro turnover and team of 44 people
About us   |   Contact   |   Terms of use   |   Privacy Policy   |   Cookies Policy
© Nx Data. All rights reserved.
NXDATA utilizeaza fisiere de tip cookie pentru a personaliza si imbunatati experienta Dumneavoastra pe site-ul nostru. Am actualizat politicile pentru a integra in acestea modificarile specificate de Regulamentul (UE) 2016/679 privind protectia persoanelor fizice in ceea ce priveste prelucrarea datelor cu caracter personal si privind libera circulatie a acestor date. Va rugam sa cititi modul in care nxdata.ro prelucreaza datele cu caracte personal. Prin continuarea navigarii pe site-ul nostru confirmati acceptarea utilizarii fisierelor de tip cookie conform termenilor de utilizare. Datele Dumneavoastra pot fi oricand sterse urmand instructiunile din document.

Am inteles
Cititi politica de cookies